Community News

Phantom Ranch Closure and Upcoming TCWL Shutoff

January 10, 2025

All Phantom Ranch operations are closed from January 2 to March 30, 2025, for the installation of new water and electric lines for the Transcanyon Waterline Project. Hikers can still access the North Kaibab Trail, however, the bypass route around Phantom Ranch may change. Please follow all closure signs and be aware that water will only be available at Boat Beach (near the Black Bridge) during this closure period.

 Additionally, from 8 a.m. on January 15 to 5 p.m. on January 19, the Transcanyon Waterline will be shut off for necessary construction work on a temporary water bypass along the River Trail. During this period, water will not be available at Boat Beach or Manzanita Rest Area. More information on water availability in the inner canyon can be found on park's Critical Backcountry Updates page.

 Water for the South Rim will be supplied from the existing storage tanks, and park management will closely monitor tank levels. Water conservation measures may be implemented until pumping is resumed to the South Rim.