Traffic Test Starts June 16th At Highway 64
June 4, 2021
Tusayan is scheduling a traffic test on Highway 64 to evaluate conditions in the hopes that ADOT will eventually repaint the lines of traffic north of town and create additional lanes of traffic. An email from the Town says these additional lanes would assist with the flow of traffic during peak conditions. The scheduled date for the equipment setup is Wednesday June 16th at 10am. The equipment is expected to be removed by June 22nd.