Construction Alert
June 24, 2026
There will be on-site utility location work performed through pothole drilling on various parcels within and near the Tusayan community over the next three to four weeks. This work is being overseen by CivilTech Engineering, Inc. and relates to the design of flood mitigation improvements as part of the Tusayan Area Drainage Master Plan. Rights of Entry have been obtained for the involved parcels.


